Pool House Pavilion Underway

From the property main residence, we approach Pool House Pavilion (Traders Point) side elevation, with open covered lounge-dining areas to the right, and interior kitchenette-living + outdoor shower to the left. Also to the left, we can see a glimpse of the guest cottage beyond.

April 21, 2025 (Traders Point) – After a long haul, Pool House Pavilion is nearing substantial completion in-time for pool season!

A renovation/addition to a pre-existing 1940s structure (now guest house), we ran into some unique underground utility concerns.  As one of two original homes on the site, this location was “utility central” for not only the original structures on this compound, but also the newer main residence built a few years ago by the prior property Owner.

We have a lot to share about this project, so please check-back for the project story which will include our design process with the architect (HAUS), and the unique circumstances we rant into during construction.